Every kitchen remodel begins with a drawing, a number and a conviction that this time it will go to plan. The drawing is tidy. The number is a sum of quotes. The conviction is what carries people through eight months of planning and five months of construction. And then a wall is opened, and behind it is a pipe nobody knew about, and the number begins to move.
Two researchers named Daniel Kahneman and Dan Lovallo gave this pattern a diagnosis in 1993: people forecast from the inside, building a story from the specific plan, and ignore how similar projects have gone for others. Bent Flyvbjerg later turned the remedy, called reference-class forecasting, into a working tool for governments, which look up how similar projects actually ended and adjust the forecast by that record. After reading the original planning-fallacy experiments, the Kahneman and Lovallo paper, Flyvbjerg’s account of the method, the United Kingdom’s current overrun data for rail and roads, a practitioner critique of the method, a study of the shape of overruns in public IT projects, and homeowner surveys with very different answers about how often remodels go over budget, my verdict is a real shared mechanism for the optimistic forecast, with a different cause for part of the overrun itself. The government tool cannot be moved to a kitchen yet, because no one has built the table of past kitchens that it requires. The article proposes building one, a remodel ledger, and a randomized trial of whether homeowners who use it forecast better.
Scientific Foundation
Begin with the experiments. Roger Buehler, Dale Griffin and Michael Ross published five studies in 1994. In the honors-thesis study, 33 students analyzed gave best-guess predictions averaging 33.9 days, and their theses took 55.5 days. Only 29.7 percent finished by the date they predicted, and even their pessimistic predictions, at 48.6 days, fell short. A study of 101 undergraduates found the same for academic and everyday tasks: predicted 5.8 days and took 10.7 for the academic ones, and predicted 5.0 and took 9.2 for the others, with 37.1 and 42.5 percent finishing on time. Telling people their accuracy would be checked changed nothing. In a think-aloud study, about 74 percent of the participants’ thoughts concerned future plan-based scenarios and about 7 percent concerned past experience [1].
The same paper tested a remedy. In a study of 123 people in three conditions, a control group and a group who simply recalled past experiences stayed optimistic, but a group who had to link past experiences to the current task showed no average optimism, and on-time completion rose from 29.3 percent in the control group to 60.0 percent. Observers, asked to predict when someone else would finish, were pessimistic by 1.7 days on average, while the actors were optimistic by 1.3 days, and observers brought up the actor’s past far more often than actors did. The authors add a limit: the remedy removed the average bias but did not make predictions more accurate in absolute terms, since they became as likely to be too pessimistic as too optimistic, and they could not rule out that people simply imagined more pessimistic scenarios [1].
The theory behind it is the 1993 paper by Kahneman and Lovallo, which argues that decision makers treat problems as unique, overlook past statistical patterns, and produce overly optimistic forecasts from an inside view based on specific plans and scenarios. I read only the abstract [2]. Flyvbjerg’s 2006 article describes the remedy in three steps: pick a reference class of similar past projects, broad enough to be statistically meaningful and narrow enough to be comparable; establish the distribution of outcomes for that class from credible data; and place the project within that distribution. His example is a curriculum project in Israel in which the team’s estimates ranged from 18 to 30 months, an expert said about 40 percent of similar teams gave up and none that finished took under seven years or over ten, and the team finished in eight years. He reports average cost inaccuracy of 44.7 percent for rail, 33.8 percent for bridges and tunnels and 20.4 percent for roads. He also lists the limits of his own work: the paper does not directly measure whether the method is more accurate in transport, some samples are modest, the outside view may miss extreme outcomes, large reserves can encourage overspending, and he was appointed by the UK Department for Transport to develop the uplifts [3].
The government data have grown since. A report for the UK Department for Transport updating its optimism-bias guidance gives reference classes from an international dataset: for rail, 355 projects with a mean cost overrun of 30 percent, a median overrun of 19 percent and an 80th percentile overrun of 60 percent, and for roads, 977 projects with a mean of 22 percent, a median of 16 percent and an 80th percentile of 47 percent. The report states that a sample of under 20 projects is too small for proper reference-class forecasting, applies the uplift to the base estimate and not to figures that already include contingency, and recounts that a 2019 review found the method generally more accurate than conventional ones, particularly early in a project. It also notes data scarcity in many UK-only classes [4].
A practitioner paper from a 2012 conference adds a warning. It describes the same three steps and notes that an uplift is specific to an institution, domain and project type, so one calculated for single-span bridges does not carry over to other kinds. It also raises a perverse incentive: a contractor who knows a 25 percent uplift will be applied might underestimate costs by 20 percent. The authors propose their own method, which the paper does not test [5].
What do overruns look like in shape? Alexander Budzier and Flyvbjerg studied 1,355 public-sector IT projects and found that the typical project had no cost overrun, with a median of 0 percent, but that about 18 percent of projects overran by more than 25 percent, and that the extreme ones typically overran by about 130 percent. About 28 percent of projects overran at all, and those needed about 47 percent more budget. The authors describe the work as preliminary, drawn from public documents of varying completeness [6]. This is a different domain, and I use it only for the shape: most projects are fine and a minority are far from it.
Now the kitchens. The 2022 Houzz and Home study, with more than 67,000 respondents surveyed in early 2022 about 2021, reports that 34 percent of homeowners went over their remodeling budget, 39 percent finished at or under, and 27 percent had no budget at all. Recent homebuyers were most likely to go over, at 45 percent. Kitchen remodels had a median spend of 15,000 dollars, and kitchen planning averaged 8.6 months, with construction almost five more months. The article cites volatile material costs, surprises behind walls and scope growth, with no figures for these. The data are self-reported, the sampling is not described, and the 2022 spending and planning figures are plans and not outcomes [7]. A contractor blog citing the 2020 version of that survey gives about 36 percent on budget, over 31 percent over budget, about 29 percent with no budget and a little over 3 percent under. The blog is promotional, and recommends holding a contingency of about 25 percent [8].
Other surveys disagree sharply. A 2025 report by a renovation company, from 1,002 homeowners planning or completing projects of 10,000 dollars or more, found that 37 percent exceeded their budget, blaming materials in 58 percent of cases, labor in 40 percent and unexpected repairs in 20 percent. The company sells renovation services, and the average overrun is not reported [9]. A 2024 survey of 1,000 homeowners by a real-estate company found that 78 percent went over budget on their most recent project, 44 percent by at least 5,000 dollars and 35 percent by at least 10,000. The summary I read also says 53 percent of those who used a contractor went over and 42 percent of those who did it themselves, which does not reconcile with the 78 percent figure. The survey describes no question wording or weighting, and gives no average overrun [10].
Cross-Domain Connection
Set the pieces side by side and one pattern is clear and one gap is wide. The pattern is the inside view. A homeowner planning a kitchen does what the thesis students did: builds a scenario from the plan, in which the contractor arrives on time, the walls hold nothing surprising and the cabinets are not backordered, and gives little weight to the record of how kitchens go. The experiments say this is not about intelligence or about the stakes, since the bias appeared in everyday tasks and survived being told that accuracy would be checked [1]. Those who plan the most may be the most exposed: kitchen planning averages more than eight months in the largest survey [7], and my reading is that months of planning add detail to the inside story without adding any outside evidence.
The gap is in the data. Flyvbjerg’s method needs a reference class, and the UK’s current classes are built on hundreds of projects with percentile bands that a planner can read off [3][4]. For home remodels, the surveys give a share over budget of about one in three in the largest sample, 37 percent in a company survey and 78 percent in another [7][9][10]. That is a spread from 34 percent to 78 percent for what sounds like the same question. The sources do not explain it. The wording, the sponsors and the respondents may differ, and none of the three reports an average overrun or a distribution. A homeowner cannot look up the 80th percentile of kitchen remodels, because no one has published it. In the language of the government report, there is no class with the 20 or more projects it considers a minimum [4].
Why would the cause differ from a bridge or a railway? Three reasons stand out. The point about experience is my reading: a homeowner remodels a kitchen perhaps once in a decade, while a contractor sees hundreds, so the outside view sits with the person who sells the work. The other two rest on the surveys. Much of the overrun is reported as hidden conditions and scope growth chosen by the owner, which are different from the strategic misrepresentation Flyvbjerg worries about in public works [3][7][8]. And the surveys show that recent buyers, who know the least about the house, were the most likely to go over, at 45 percent [7]. A forecast that cannot see behind the wall is inside-view by construction.
It also matters what the tool should give back. The public IT data suggest the shape is a fat tail, a median close to the budget and a minority of projects far beyond it [6]. If remodels are similar, which is my guess and not a finding, then a flat contingency such as the 25 percent in the contractor blog [8] is a blunt instrument, too large for the many and too small for the unlucky few. A percentile band, such as the median and the 80th percentile in the government tables [4], would let a homeowner choose a level of risk, and would show the size of the tail.
The Buehler experiments suggest another lever that costs nothing. Observers predicted more pessimistically than the people doing the task, and their forecasts rested on the actor’s past [1]. For a homeowner, the observer is a neighbor who finished a kitchen last year. Asking them what they planned and what they paid is the outside view in its cheapest form, like standing in the street and counting the dumpsters before drawing the plans.
The following is my own proposal and is not an existing program. I will call it the remodel ledger. Homeowners and contractors would voluntarily record, at contract signing, the budget and the planned duration, and at completion the final cost and the actual duration, with a short description of the scope: same footprint or moved walls, plumbing or gas moved or not, age of the house and region. The ledger would publish the median and the 80th percentile for each scope class once it has at least 20 projects, following the threshold in the government report [4]. A homeowner would then set contingency at a chosen percentile of a similar class and not at a flat rule, and would be asked, as in the experiment that worked, to say how each of the three most similar past projects bears on their own plan [1].
What Remains Undemonstrated
Nobody I found has tested reference-class forecasting on a household project. The planning-fallacy experiments used theses and chores, not remodels, and the remedy that worked did not improve absolute accuracy [1]. The government method is supported mainly by a review summarized in a government report and by the advocate’s own paper, which says it did not directly measure accuracy in transport [3][4]. The conference paper’s own alternative is untested [5].
The homeowner numbers are weak. The three surveys disagree, two come from companies with a commercial interest, all are self-reported with little methodology described, and none reports an average overrun [7][9][10]. Even the figure I leaned on most, 34 percent in the largest survey, mixes professional and do-it-yourself projects without breaking them out [7]. I cannot say from these sources how large a typical kitchen overrun is, or whether the tail is as fat as in public IT projects [6].
The ledger has its own risks. Voluntary data are biased toward the willing, and early entries may come from homeowners who are organized and contractors who are proud of their record. Flyvbjerg warns that large reserves can encourage overspending, and the conference paper warns about contractors padding or underbidding in response to a known uplift [3][5]. Scope classes might be too thin for the unusual house. And an honest percentile could alarm people into abandoning projects they should do.
The trial I propose is a randomized comparison among homeowners about to sign a kitchen contract. One arm plans as usual. The other receives an outside-view packet: ledger percentiles for a matched scope class, a call with a neighbor who finished a similar project, and the recall-relevant prompt from the experiment [1]. Record the forecast and contingency at signing, then the final cost and the duration, and measure the ratio of actual to forecast, the share over budget, the contingency set, stress and satisfaction at completion. What would prove the idea wrong is no difference in forecast error between the arms, or a higher final cost in the outside-view arm, which would suggest that reserves get spent [3].
Why It Matters
A remodel is often the largest discretionary purchase a household makes, and it is made by amateurs against professionals who hold the data. A median kitchen remodel of 15,000 dollars in the largest survey [7] is real money to most families, and the tail is where the damage is: the unlucky few who borrow, stop mid-project or sell. A tool that lets a person see the tail before signing is worth more than another checklist of tips.
The wider point is about whose view counts. Experts at big institutions have learned to ask how similar things went, because their own history embarrassed them [3][4]. Households do not have that embarrassment or that record. Making the record public, and putting it in the hands of the person who pays, would turn private regret into shared evidence.
Human Dimension
Almost everyone who has remodeled has a story about the day the number changed, and most of those stories end with a sense of having been foolish. The research says it is not foolishness. It is how planning minds work, and it appeared in students with a thesis to finish and in governments with a bridge to build [1][3]. The kinder reading is that nobody told them how often the wall hides something, because nobody had counted. The ledger would count, and a person standing at the edge of a big decision would have the street’s view as well as the blueprint’s.
Sources
- Buehler, Griffin and Ross, “Exploring the Planning Fallacy: Why People Underestimate Their Task Completion Times,” Journal of Personality and Social Psychology, 1994 (five studies; 33 thesis students analyzed; remedy did not improve absolute accuracy; I read the opening 100,000 characters of a summary produced by the fetch tool), https://bear.warrington.ufl.edu/brenner/mar7588/Papers/buehler-et-al-1994.pdf
- Kahneman and Lovallo, “Timid Choices and Bold Forecasts: A Cognitive Perspective on Risk Taking,” Management Science, January 1993 (abstract record at IDEAS; I read a summary produced by the fetch tool), https://ideas.repec.org/a/inm/ormnsc/v39y1993i1p17-31.html
- Flyvbjerg, “From Nobel Prize to Project Management: Getting Risks Right,” Project Management Journal, 2006 (steps of reference-class forecasting; transport cost inaccuracy; the author was appointed by the UK Department for Transport to develop the uplifts; does not directly measure accuracy in transport; I read a summary produced by the fetch tool), https://arxiv.org/pdf/1302.3642
- UK Department for Transport report updating the evidence behind the optimism bias uplifts for transport appraisals (rail 355 projects and road 977 projects; median and 80th percentile uplifts; a sample under 20 considered too small; I read a summary produced by the fetch tool), https://assets.publishing.service.gov.uk/media/6093d448e90e0726f52fc54c/updating-the-evidence-behind-the-optimism-bias-uplifts-for-transport-appraisals.pdf
- Project Management Institute conference paper, “Planning for the planning fallacy,” 2012 (practitioner paper; critique of uplifts; proposed alternative method is untested; I read a summary produced by the fetch tool), https://www.pmi.org/learning/library/planning-fallacy-causes-solutions-project-expectations-6374
- Budzier and Flyvbjerg, “Overspend? Late? Failure? What the Data Say About IT Project Risk in the Public Sector,” Commonwealth Governance Handbook, 2012 (1,355 public-sector IT projects; preliminary; I read a summary produced by the fetch tool), https://arxiv.org/pdf/1304.4525.pdf
- Houzz, blog post on the 2022 Houzz and Home Study (more than 67,000 U.S. homeowners; 34 percent over budget; kitchen planning and construction months; self-reported; planning and spending figures for 2022 are forward-looking; I read a summary produced by the fetch tool), https://pro.houzz.com/pro-learn/blog/remodeling-activity-and-spending-hit-highest-levels
- Reico Kitchen and Bath, “Here’s Why Remodels Go Over Budget, and How to Avoid It,” 2020 (company blog; cites the 2020 Houzz and Home survey; recommends about 25 percent contingency; I read a summary produced by the fetch tool), https://www.reico.com/about-us/blog/2020/heres-why-remodels-go-over-budget-and-how-to-avoid-it/
- Block Renovation, “How America Renovates” 2025 report (1,002 homeowners; 37 percent over budget; causes materials, labor and unexpected repairs; the company sells renovation services; no average overrun; I read a summary produced by the fetch tool), https://www.blockrenovation.com/guides/how-america-renovates-in-2025
- Clever Real Estate, home renovation trends survey, August 2024 (1,000 homeowners; 78 percent over budget on the most recent project; company-run, self-reported; the contractor and DIY percentages in the summary do not reconcile with the overall figure; I read a summary produced by the fetch tool), https://listwithclever.com/research/home-renovation-trends/